The Myrtle Beach WWTP project included significant upgrades to the existing wastewater treatment plant. Harper’s scope of work included installing a new influent pump station and headworks, a new electrical building and generator, and yard piping connecting the new structures to the existing plant influent lines and existing aeration basins. The excavation for the new influent pump station was 35’ deep and completed with sheet pile shoring walls and a dewatering system.
Myrtle Beach WWTP Headworks
Myrtle Beach, SC
Client
Grand Strand Water and Sewer Authority
Delivery Method
Design-Bid-Build