International Drive Booster Pumps Station

McCormick, SC

Client
McCormick Commission of Public Works
Delivery Method
Design-Bid-Build

Project Description

The scope includes civil and site work, installation of 42” suction and discharge piping, system connections to existing transmission mains, installation of new booster pump station and yard piping, installation of pumps, installation of ATS and emergency generator, miscellaneous valving and piping, electrical work, and controls.

Features:

  • Our team used BIM technology for pipe layout and installation at two tie-ins to existing transmission mains. Additionally, BIM was used to lay out and install all piping and equipment within the booster pump station.
  • Due to significant material delays, the project team had to work with the owner and engineer to change the sequence of construction to meet the overall project schedule. This resulted in phased construction which took place as the delayed material became available.