Access Point Industrial Park

Simpsonville, SC

Client
Access 100, LLC
Delivery Method
Design-Build

Project Description

Harper constructed the shell of two buildings at Access Point Industrial Park. The industrial campus included two buildings of 156,000 square feet and 158,760 square feet respectively. Harper also graded the 53-acre site. The buildings are tilt-up construction with access to I-385 and I-185.

Harper was invited back to construct the third 293,530 square foot building on the campus in 2022.